Delayed Scheduling under Resource Constrains


The Transactions of the Korea Information Processing Society (1994 ~ 2000), Vol. 4, No. 10, pp. 2571-2580, Oct. 1997
10.3745/KIPSTE.1997.4.10.2571,   PDF Download:

Abstract

In this paper, we deal with the resource constrain scheduling to execute behavior algorithm under resource limit. Expecially, we proposed a scheduling algorithm, called delayed scheduling, which finds the lower bound control step to assign operation under resource limit. We take in account the actual scheduling problems including multicycle operation and functional pipelining. Integer Linear Programing formulations are used to the scheduling problems in order to get optimal scheduling result. Experiment was done on the DFG model of fifth-order digital wave filter, to show it's effectiveness.


Statistics
Show / Hide Statistics

Statistics (Cumulative Counts from September 1st, 2017)
Multiple requests among the same browser session are counted as one view.
If you mouse over a chart, the values of data points will be shown.


Cite this article
[IEEE Style]
S. I. Soo and Y. K. Man, "Delayed Scheduling under Resource Constrains," The Transactions of the Korea Information Processing Society (1994 ~ 2000), vol. 4, no. 10, pp. 2571-2580, 1997. DOI: 10.3745/KIPSTE.1997.4.10.2571.

[ACM Style]
Shin In Soo and Yi Keun Man. 1997. Delayed Scheduling under Resource Constrains. The Transactions of the Korea Information Processing Society (1994 ~ 2000), 4, 10, (1997), 2571-2580. DOI: 10.3745/KIPSTE.1997.4.10.2571.