A Method for Reactive Scheduling using Rule-based Constraint Satisfaction Problem


The Transactions of the Korea Information Processing Society (1994 ~ 2000), Vol. 7, No. 10, pp. 3113-3118, Oct. 2000
10.3745/KIPSTE.2000.7.10.3113,   PDF Download:

Abstract

A framework proposed in this paper includes representations of multi-objectives rule-based constraint satisfaction problem(RCSP) and especially, flexible structure of RCSP which provides adequate solution within an expectation time and adaptively considers some change of constraints on the RCSP. In this study, the power system implemented by above framework is entirely programmed by using a modeling system for the quantitative model and a rule-based constraint programming tool for the qualitative model. The results of an exemplary case show how the structure that involves the problem representation gives the scheduler an effective decision and what are the advantages of the easy and diverse representation for considering the technical characteristics of the units on the RCSP over the traditional problem.


Statistics
Show / Hide Statistics

Statistics (Cumulative Counts from September 1st, 2017)
Multiple requests among the same browser session are counted as one view.
If you mouse over a chart, the values of data points will be shown.


Cite this article
[IEEE Style]
C. S. Kim, "A Method for Reactive Scheduling using Rule-based Constraint Satisfaction Problem," The Transactions of the Korea Information Processing Society (1994 ~ 2000), vol. 7, no. 10, pp. 3113-3118, 2000. DOI: 10.3745/KIPSTE.2000.7.10.3113.

[ACM Style]
Chul Soo Kim. 2000. A Method for Reactive Scheduling using Rule-based Constraint Satisfaction Problem. The Transactions of the Korea Information Processing Society (1994 ~ 2000), 7, 10, (2000), 3113-3118. DOI: 10.3745/KIPSTE.2000.7.10.3113.